Reduce fuel waste without losing service
Compare maintenance timing, operating changes and vehicle allocation. Keep the delivery obligation in the decision alongside the expected saving.
SupraOS turns operating evidence into a plan for lower fuel or energy use. It fits maintenance and operating changes around service commitments, carries out approved work and measures the result against comparable conditions.
10,000 litres over 40,000 km
Keep the planned route coverage
Four days committed elsewhere
The fleet or site owner, with the responsible maintenance authority.
Maintained service and a measured reduction under comparable operating conditions.
Explore the plan yourself, or play the walkthrough. Change the capacity, commitments or result record to test what happens.
Interactive examples with fictional records. No customer systems are connected.
One route group has elevated fuel intensity. Maintenance and operating changes compete with workshop work required to keep other vehicles in service.
Compare maintenance timing, operating changes and vehicle allocation. Keep the delivery obligation in the decision alongside the expected saving.
Connect the meter signal to equipment schedules, occupancy or production. Compare approved operating changes and the maintenance they require.
Check the relevant operating conditions and repeat the observation. A fall in distance, load or output must not masquerade as an efficiency improvement.
Bring a defined operation, baseline records and the owner who can approve a change. Agree the required service, available maintenance capacity and the measurement conditions before the work begins.
Begin with the relevant records and agreed permissions. Expand from an outcome whose work, cost and result can be inspected.
Discuss a fuel or energy outcomeThe owner-accepted fleet record covers 118 vehicles, a 90-day baseline and a 31-day post-change period. The normalized intensity reduction is measured; annual fuel, cost and emissions savings are estimates.
Read the Climate Charters recordInspect the measurement methodOne SupraOS. The same Company Twin, predictions, resource decisions, execution controls, verification and learning across each application.
It is the fuel and energy application of SupraOS: operating evidence, a better plan, approved corrective work and checked savings.
The fleet record reports an owner-accepted 8.1% normalized fuel-intensity reduction across 118 vehicles. It uses a 90-day baseline and a 31-day post-change period. The full record separates that measurement from annual estimates.
No. The interactive examples and calculator show how the decision and arithmetic work. A deployment uses its own operating records, measurement method and accepted result.
Bring the result, the responsible owner and the conditions that need to change. We’ll define the first scope and its success measure.